17+ years · ★ 5.0 GoogleOver 17 years designing & supplying lighting · since 200965+ years' combined team experience★ 5.0 from 71 Google reviewsLondon & Bristol020 3773 7530

ESOS Phase 4: how lighting retrofit can help

By , 299 Lighting · Published · 6 min read

In short

ESOS progress updates are due by 5 December 2026 and Phase 4 is under way. Where lighting retrofit fits into ESOS audits and action plans.

ESOS Phase 4: how lighting retrofit can help

CIBSE Certification's November newsletter reports that the Environment Agency and DESNZ are hosting a workshop, Preparing for ESOS Phase 4 for Lead Assessors, on 17 November in Birmingham. It also notes the ESOS Progress Update 2 deadline of 5 December 2026 (CIBSE Certification).

For large businesses, ESOS is a regular reminder to look at where energy goes. Lighting is often one of the most straightforward areas to improve. This guide explains the key ESOS dates and how a lighting retrofit can fit into an assessment and action plan.

ESOS in brief

The Energy Savings Opportunity Scheme (ESOS) applies to large UK undertakings and their corporate groups. According to GOV.UK:

  • An organisation qualifies for Phase 4 if, on 31 December 2026, it employs 250 or more people, or has an annual turnover over £44 million and an annual balance sheet total over £38 million
  • Corporate groups qualify if at least one UK group member meets the definition
  • Public sector organisations do not usually need to comply
  • The deadline for the Phase 4 notification of compliance is 5 December 2027
  • For Phase 4, Display Energy Certificates and Green Deal assessments can no longer be used as alternative compliance routes
  • Progress against action plan commitments must be included in the ESOS assessment, with an explanation where commitments have not been met

Key dates

DateWhat happens
17 November 2026Environment Agency and DESNZ workshop for lead assessors, Birmingham
5 December 2026Phase 3 annual progress update due
31 December 2026Phase 4 qualification date
5 December 2027Phase 4 notification of compliance deadline

Always check the latest guidance on GOV.UK and with your lead assessor.

Where lighting fits

ESOS assessments look for cost-effective energy saving opportunities. In many offices, warehouses, schools and retail spaces, lighting runs for long hours, so improvements can make a real difference. Typical lighting opportunities include:

Retrofit or replace?

A full replacement is not always necessary. With reLUMEN8, the existing housing is kept and a new LED engine and driver are fitted. That can mean:

Read retrofit vs replace for the full comparison.

Using retrofit in your action plan

If your organisation has ESOS action plan commitments, a lighting retrofit can be planned in phases to fit budgets and building programmes. A few steps help:

Links with other requirements

ESOS sits alongside other drivers. Fluorescent lamps are being phased out in Great Britain (the fluorescent lamp phase-out), landlords face minimum energy efficiency standards (lighting and EPC ratings) and many companies report on ESG (ESG reporting). A lighting retrofit can support several of these at once. See also net zero lighting.

Who benefits most

Organisations with many buildings and long operating hours tend to see the largest lighting savings. That includes multi-site offices, warehouses, retail chains and hospitality groups. See office lighting upgrades for landlords and retrofit for co-working and hospitality.

What a lighting survey records

A good survey gives your lead assessor the information needed to assess lighting opportunities. It usually includes:

  • The number and type of fittings in each area
  • Lamp or LED type and wattage
  • Hours of use and how lighting is controlled
  • The condition of housings and diffusers
  • Any emergency lighting fittings
  • Ceiling type and access

With this information, savings can be estimated and the right approach chosen for each area. Our guide to whether a housing is worth keeping explains how condition is assessed. For specific fitting types, see retrofit for modular panels and retrofit for linear pendants.

After the retrofit

Once the work is complete, keep records of what was installed, where and when, along with commissioning data for any controls. Metering or energy data before and after the work helps show the savings achieved. This makes the next ESOS assessment simpler, and supports progress reporting against your action plan.

How 299 Lighting can help

reLUMEN8 is delivered by 299 Lighting. We can survey your buildings and provide information to support your energy assessments. Find out more about the 299 Lighting retrofit service and our services, or contact the team. If you need new luminaires, see linear-led.com on surface linear for refurbishment and recessedlighting.co.uk on recessed lighting refurbishment. Before you send details, read what to send for a retrofit quote.

Thinking about a retrofit?

Send us photos of your existing fittings, the location and rough quantities. A Light Engineer will tell you whether reLUMEN8 is viable.

Start a project →

Frequently asked questions

Who must comply with ESOS Phase 4?

Large UK undertakings: those with 250 or more employees, or turnover over £44 million and a balance sheet over £38 million, on 31 December 2026.

When is the ESOS Phase 3 progress update due?

GOV.UK states the Phase 3 annual progress update is due by 5 December 2026.

When is the Phase 4 compliance deadline?

The Phase 4 notification of compliance deadline is 5 December 2027.

Can lighting retrofit count towards ESOS?

Lighting improvements are a common energy saving opportunity. Your lead assessor will decide how they appear in your assessment.