In short
reLUMEN8 works in four steps: schedule a call, assess a sample fitting with a site survey, refurbish and test fittings off site, then deliver them ready to install with a renewed 5-year warranty.

reLUMEN8 is designed to make LED upgrades simple.
1. Schedule a call
Speak to a Light Engineer. Share images, the location and your goals.
2. Assessment
We collect a sample fitting, assess viability and draw up a quote. A site survey and testing take place at this stage.
3. Collection, refurbishment and testing
Fittings are brought to our specialised facility, refurbished and tested.
4. Delivery
Fittings return to site ready for your contractor to install, with a renewed 5-year warranty.
Book a call to get started.
Further reading at 299 Lighting
Next steps on relumen8.com
Thinking about a retrofit?
Send us photos of your existing fittings, the location and rough quantities. A Light Engineer will tell you whether reLUMEN8 is viable.
Start a project →Frequently asked questions
What is the first step in reLUMEN8?
Scheduling a call with a Light Engineer to share images, location and goals.
Where are fittings refurbished?
At 299 Lighting's specialised facility, where they are also tested.


